Русские видео

Сейчас в тренде

Иностранные видео


Скачать с ютуб This Build Took A Whole Year, Let's Hope This Works Out! в хорошем качестве

This Build Took A Whole Year, Let's Hope This Works Out! 1 месяц назад


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса savevideohd.ru



This Build Took A Whole Year, Let's Hope This Works Out!

This was the Biggest challenge we've ever taken on. Hailey and I volunteered our summer to Build an adaptive mountain bike trail with BC inspired features. We are built through some of the most heinous boulder gauntlet. Everybody who walked this section said it was not going to be possible. Going into this phase of the build we knew this was going to be the most hardest part of the build but that's also what made this so rewarding. This trail will be officially opening in 2024 as part the Driving Range. Skidmarks T-shirts : https://philkmetz.com/skills-with-phi... My Riding Channel ‪@SkillsWithPhil‬ Episode 1    • Building & Testing A Technical Rock S...   Episode 2 h   • They Don't Teach This in School: Buil...   Episode 2.5    • Clearing Trees After an Unexpected Wi...   Episode 3    • No Room For Error, Building Between a...   Episode 4    • No Turning Back, Building Our Way Out...   Episode 5    • They Said Building a Trail Here Was I...   Episode 6    • This Build Took A Whole Year, Let's H...   More Information Where - Bolton Vermont Name of trail System "Driving Range" Part of Richmond Mountain Trails https://www.richmondmountaintrails.org/   / richmondmountaintrails  

Comments