Русские видео

Сейчас в тренде

Иностранные видео


Скачать с ютуб 2 Innerdoorless 60s SCHINDLER Lifts with ORIGINAL MOTOR in Biel, Switzerland в хорошем качестве

2 Innerdoorless 60s SCHINDLER Lifts with ORIGINAL MOTOR in Biel, Switzerland 1 год назад


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса savevideohd.ru



2 Innerdoorless 60s SCHINDLER Lifts with ORIGINAL MOTOR in Biel, Switzerland

Timestamps: 0:00 intro 0:25 normal ride 3:52 motor room 7:18 car top / lift shaft These lifts are situated in a mixed use building in the city of Biel/Bienne. They were installed upon construction of the tower block which contains offices and apartments. The lifts are set up as a group of two. The floor layout of the building consists of a basement (French SS = Sous Sol), ground floor (French P = Parterre), intermediary floor (German ZG = Zwischengeschoss) and the upper floors 1 to 14. The motor room is located on floor 14, which is only served by the smaller lift on the left. The layout of the lifts is very unique: As the highest floor served by the smaller lift is the motor room floor, the motor of said lift is located next to the shaft and the ropes go upwards from the traction sheave and are then diverted over above the shaft via two sheaves for the car and counterweight respectively. The bigger lift on the right is built in a normal top drive configuration as it does not serve the top floor. It also skips the intermediary floor ZG. Due to the motor room being directly above the 13th floor, the big lift has a reduced headroom. The lifts are driven by Schindler W56 winches with two dedicated motors for slow and fast speeds. In order to fit both machines into the motor room, the motors for the big lift were placed on both sides of the winch. The motor for fast speed contains brushes in order to subsequently reduce rotor resistance until shorted upon each start. This helps to reduce the inrush current and is done via the large wire resistors above the winch. The lifts have been modernised in 1999. The electrical installation has been completely rebuilt with new BP302 controllers and new DMG fixtures. A VFD has not been added, the list still remain with a standard 2-speed drive today. The original motors have been kept, which makes these lifts a true rarity! In 2019 the BP302 controller has been swapped for the newer BP408 with the logic cabinet including all the wiring remaining untouched. This is a big upgrade as the BP408 is a way more reliable controller and it makes these lifts even more unique, as one usually never sees this modern controller with a 2-speed drive configuration. Manufacturer: Schindler, 1960s Modernised: Schindler, 1999, 2019 (swap BP302 for BP408) Type: Traction, 1:1 roping Fixtures: DMG B5 Speed: 1.2 m/s Logic: Böhnke+Partner BP408 Drive: Standard 2-speed Motor: Schindler W56, 7.5 kW Left Lift (small): Capacity: 6 persons / 480 kg Floors: 17: SS, P, ZG, 1-14 Travel height: 46.6m Right Lift (big): Capacity: 6 persons / 500 kg Floors: 15: SS, P, 1-13 Travel height: 43.7m WARNING/DISCLAIMER: DO NOT attempt to copy anything shown in the video without having the proper knowledge of how to do so! LIFT SHAFTS and MACHINE ROOMS are very DANGEROUS places and are NOT MEANT to be accessed by inexperienced or untrained personnel! Dangers in these environments include but are not limited to crushing, electrocution, falling and burns. Recording: Q2 / 2021

Comments